Complete interruption due to maintenance work, from Friday 27 March 2026 19.30 to Monday 30 March 2026 at 4.30
Total interruption due to works between Vevey – Blonay – Tusinge (Chevalleyres from 20.20) from Friday 27 March 2026 19.30 to Monday 30 March 2026 at 4.30.
All trains are cancelled and replaced by a bus service running to a special timetable (please check the timetable online).
Please note that journey times will be longer.
Connections cannot be guaranteed.
Bicycles cannot be transported.
Emplacements des arrêts:
Vevey: à l'extrémité du quai 3 (extrémité voie 7)
Vevey-Vignerons: Sur le pont, arrêt de bus VMCV Pra
Hauteville: Pas desservie durant l'interruption
Château-d 'Hauteville: Bifurcation Montéliza, rte de St-Légier
St-Légier-Gare: Au bord de la route cantonale
St-Légier-Village, Arrêt bus VMCV St-Légier Village
La Chiésaz: Devant le Collège et vis-à-vis
Château-de-Blonay: A la hauteur du passage à niveau de Cojonnex
Blonay: A la gare
Prélaz: Pas desservie durant l'interruption
Tusinge: Au bord de la route de Châtel-St-Denis
Chevalleyres (dès 20h20): au centre des Chevalleyres
Le transport des vélos est exclus.
Nous vous remercions de votre compréhension.
Download file